The First March 2019 101/1001 Update
Mar. 17th, 2019 09:43 pmLife is 10% what happens to you and 90% how you react to it. - Charles R. Swindoll
Goals Completed: 25/108
Goals in Progress: 31
Body/Martial Arts/Physical Improvement/Testing Myself: No real progress. My baselines are still: pushups (25), situps (35). I'll be back to upper body workouts next week after I finish my EMT program.
Mind/Spirit/Centering/Health: I have sat Zazen for the month. I will be fasting (long overdue) next week. I'm still sporadically practicing mindful eating. I've started another book in my permanent library, but I've not read any of it, again, until after my EMT program. Haiku!
Maintenance/Shit Got To Be Done: No progress.
In Case of Zombies/Disaster Preparation: I have now completed all of the 10 quizzes, passed my EMT cognitive final with a 92%, and I have passed 8 of 10 state-certification practical tests for my EMT program. I have gotten a consult to get permanent solar panels installed on the bus this month, and parts are being ordered. First, we have to upgrade the lights systems onboard the bus so they draw less power, and that should happen about the end of the month. I will be testing my temporary, portable system for emergency power after I pass the EMT program. Land acquisition is now in the functional testing stage.
Travel/Adventure/Doing Stuff: No progress.
Hiaku
life on hold,
everything else waiting
only practicals
so much potential -
land, travel, connections
a motivation
Spring is coming,
a noticeable change -
sun later in the day
Goals Completed: 25/108
Goals in Progress: 31
Body/Martial Arts/Physical Improvement/Testing Myself: No real progress. My baselines are still: pushups (25), situps (35). I'll be back to upper body workouts next week after I finish my EMT program.
Mind/Spirit/Centering/Health: I have sat Zazen for the month. I will be fasting (long overdue) next week. I'm still sporadically practicing mindful eating. I've started another book in my permanent library, but I've not read any of it, again, until after my EMT program. Haiku!
Maintenance/Shit Got To Be Done: No progress.
In Case of Zombies/Disaster Preparation: I have now completed all of the 10 quizzes, passed my EMT cognitive final with a 92%, and I have passed 8 of 10 state-certification practical tests for my EMT program. I have gotten a consult to get permanent solar panels installed on the bus this month, and parts are being ordered. First, we have to upgrade the lights systems onboard the bus so they draw less power, and that should happen about the end of the month. I will be testing my temporary, portable system for emergency power after I pass the EMT program. Land acquisition is now in the functional testing stage.
Travel/Adventure/Doing Stuff: No progress.
Hiaku
life on hold,
everything else waiting
only practicals
so much potential -
land, travel, connections
a motivation
Spring is coming,
a noticeable change -
sun later in the day