Dec. 21st, 2020 04:22 pmBody/Martial Arts/Physical Improvement/Testing Myself: No changes.
Mind/Spirit/Centering/Health: No changes.
Maintenance/Shit Got To Be Done: The Whorse is almost out of the shop; it should be ready early next week.
In Case of Zombies/Disaster Preparation: It's official - The landlord has made an offer on another place, and I have had less than three days to prepare for the 'staging' of prospective buyers coming into The Staging Area (irony, anyone?). I managed to reduce my footprint in my room to the bare necessities, and organize and consolidate all of my gear to be ready to move to storage. My landlord has refunded me my rent and is also paying for transport to the storage of my stuff. I managed to get everything important packed and stacked in a few hours, between breaks from my clients. I'm calling this another evac drill. *wry smile*
Base Station/Ol' Number 3: It continues to be wet every day, and excavator work is still delayed. The Gate House heat pump has been installed. NO update on the contractor and his assistant's COVID-19 test results. No progress with the Pump House. No more progress on hand-digging the RV Dump line to the septic system; I will install the sewer pipe and backfill the trench over the Christmas 'holiday'. I managed to get 15 gallons into the potable water tanks for the RV, and dump the grey and black water tanks during a rainstorm, so The Old Man will be OK.
Travel/Adventure/Doing Stuff: No progress. The Old Man and I are still in a two-week quarantine until the 30th because of both probable exposures and because of extended time in a hospital facility. No COVID-19 symptoms noted for either the Old Man or myself. The Old Man is healing from his outpatient surgery well, but no pathology reports as of yet.
Mind/Spirit/Centering/Health: No changes.
Maintenance/Shit Got To Be Done: The Whorse is almost out of the shop; it should be ready early next week.
In Case of Zombies/Disaster Preparation: It's official - The landlord has made an offer on another place, and I have had less than three days to prepare for the 'staging' of prospective buyers coming into The Staging Area (irony, anyone?). I managed to reduce my footprint in my room to the bare necessities, and organize and consolidate all of my gear to be ready to move to storage. My landlord has refunded me my rent and is also paying for transport to the storage of my stuff. I managed to get everything important packed and stacked in a few hours, between breaks from my clients. I'm calling this another evac drill. *wry smile*
Base Station/Ol' Number 3: It continues to be wet every day, and excavator work is still delayed. The Gate House heat pump has been installed. NO update on the contractor and his assistant's COVID-19 test results. No progress with the Pump House. No more progress on hand-digging the RV Dump line to the septic system; I will install the sewer pipe and backfill the trench over the Christmas 'holiday'. I managed to get 15 gallons into the potable water tanks for the RV, and dump the grey and black water tanks during a rainstorm, so The Old Man will be OK.
Travel/Adventure/Doing Stuff: No progress. The Old Man and I are still in a two-week quarantine until the 30th because of both probable exposures and because of extended time in a hospital facility. No COVID-19 symptoms noted for either the Old Man or myself. The Old Man is healing from his outpatient surgery well, but no pathology reports as of yet.